Dar El-Mona Project
|
|
|
Project :
|
Dar El-Mona Project
|
|
Client:
|
El-Mona Company Child Care
|
Consultant:
|
Soil Mechanics And Foundations Research
Laboratory Cairo University
|
Location
|
Cairo-Alexandria Desert Road
|
Budget:
|
Approximately 800,000 LE
|
Duration:
|
From February 2004 till May 2004
|
Type Of Works:
|
Soil Nailing
|
Project Description:
|
A soil nailing system was proposed to support and stabilize an existing stone gravity type wall having some collapses. Bauer Egypt with the aid of its mother company Bauer Spezialtiefbau in Germany designed and installed a soil nailing system to stabilize the existing gravity wall and prevent further future collapses along the southern side of the
project. The total area for which the nailing system was installed was approximately 1600 square meters.
The total number of soil nails installed for the project is 420 nails having lengths varying from 6 to 11 meters.
|
|
|
|
|