Post Grouted Bored Piles Projects
 
San Stefano Complex Project
Nile Plaza Complex Project
Hayat Hotel
 
Post Grouted Piles Complete List
 


      HYATT Hotel Project ( 870-Room Hotel At Le Meredien Site )

      
Project :

HYATT Hotel Project ( 870-Room Hotel At Le Meredien Site )

Client:

Egyptian-Saudian Co.

Consultant:

A.C.E.

Location

Cairo

Budget:

Approximately 34,000,000 LE

Duration:

From November 1995 till July 1998

 

Type Of Works:

 

Post Grouted bored piles, Diaphragm Walls, Jet Grouting, Dewatering, Ground Anchors and micro piles.

Project Description:

It is one of the most important key projects in the history of Bauer Egypt. It actually utilized all of Bauer Egypt's activities at that time. It included deferent diameters post grouted bored piles to receive the hotel's loads, diaphragm walls supported by three rows of ground anchors (Tow of them were below ground water level) and a horizontal jet grouting blanket to form the box which shall receive the six floors garage, H-beam wall to support three meters of one side of the excavation and micro piles to support the entrance ramp of the hotel's Galleria.

 

         



Copyright©2003 Bauer Egypt.
All rights reserved
This Site is updated and maintained by BAUER EGYPT