Kafr
El-Zayat Bridge
|
|
|
Project :
|
Kafr
El-Zayat Bridge.
|
Client:
|
Hassan Allam Co.
|
Consultant:
|
North Coast Development Authority / ACE
|
|
|
|
Location
|
Outside
Kafr El-Zayat
city.
|
Budget:
|
Approx.
15,000,000 L.E.
|
Type Of Works:
|
On
and Off-shore
piling works.
|
Project Description:
|
The new KAFR El-ZAYAT bridge is one of the new bridges that shall be constructed to replace the old Nile crossing bridge. Kafr
El-Zayat bridge crosses over the river Nile and it shall include for two navigational openings 404 meters wide each.
Due to the importance and urgency of the project, 80 % of the piling works of the bridge were awarded to Bauer Egypt and the remaining 20 % were awarded to two other foundation contractors.
|
|
|
|
|