Projects
 
Cairo Metro L3
 
Eldiar El-Qataria
 
Quay Wall Construction (K.G.L)
 
Methanoal
 
Zamalek Ressidence
 


      
Methanoal – Damietta Port – Egypt

 

 
Project : Egypt Methanol Project
Client: Methanex
Consultant: Techint

Location

Damietta Port ,Egypt

Budget: 9,836,900 L.E
Type Of Works: Piling Works
 

Project Description:

 

One Of The Largest Petrojet project at damietta port to construct Methanol factory , Bauer Excuted 390 no. of pile with diameter800mm and 37m length and 260 no. of 600mm diameter with length 37m.

 

     



Copyright©2003 Bauer Egypt.
All Rights Reserved
This Site Is Being Updated And Maintained By
BAUER EGYPT