Project Description:
|
The owners of
Haarmann & Reimer Factory
decided to build an
extension for their new
factory in 6th of October
City. The only problem was
the limitation on available
land space, so it was
decided to install 72
micro-piles around the
existing factory to receive
the loads from a new frame
which shall carry the
desired additional
three-storey extension. All
installed micro-piles were
10.5 meters deep, 150mm
diameter and reinforced with
one-32mm steel bar to
receive a working load of 15
ton.
|