Micro-Piles Projects
 
Cairo South Power plant Relocation
 
Extension For Haarmann & Reimer Factory
 
Micro-Piles Projects Complete List
 


      Extension For Haarmann & Reimer Factory

      
Project :

Extension For Haarmann & Reimer Factory.

      
Client:

Haarmann & Reimer.

Consultant:

German Consultants.

Location

6th Of October City

Budget:

Approximately 400,000 LE

Duration:

From September 2003 till October 2003

Type Of Works:

Micro piles.

 

Project Description:

 

The owners of Haarmann & Reimer Factory decided to build an extension for their new factory in 6th of October City. The only problem was the limitation on available land space, so it was decided to install 72 micro-piles around the existing factory to receive the loads from a new frame which shall carry the desired additional three-storey extension. All installed micro-piles were 10.5 meters deep, 150mm diameter and reinforced with one-32mm steel bar to receive a working load of 15 ton.

 

            



Copyright©2003 Bauer Egypt.
All rights reserved
This Site is updated and maintained by BAUER EGYPT