Sheraton Heliopolis Project
|
|
|
Project :
|
Extension Of
Sheraton Heliopolis Project.
|
|
|
|
|
Client:
|
Gulf
Egypt for Hotels & Tourism.
|
Consultant:
|
Dr.
Ali Abdul-Rahman.
|
Location
|
Heliopolis,
Cairo.
|
Budget:
|
Approx. 5,000,000 L.E.
|
Duration:
|
Six Months
|
Type Of Works:
|
Temporary Shoring System. [Berlin Walls]
|
|
Project Description:
|
Recently it was decided to build a new seven
stars hotel adjacent to
the existing Sheraton Heliopolis hotel. With the need to reach deep excavation
levels for the new project came the role of Bauer Egypt to
retain the very large (and deep) excavation pit using Berlin-walls. The
project could successfully reach the required excavation levels
as designed and planned.
|
|
|
|
|
|
|
|
|
|